The Stallion REE Project is located in south-central Western Australia, around 200km northeast of Kalgoorlie. The Stallion Project hosts a historical, defined by Manhattan Corporation in 2017, Inferred Resource (JORC 2012) for the Stallion uranium deposit of 9.9 million tonnes (Mt), for 3.3 million pounds (Mlb) grading 150ppm U30811. SUM is working toward restarting this uranium resource.

Summit currently holds 196 km2 of exploration tenements at the Stallion Project, underlain by Tertiary palaeochannels within the Gunbarrel Basin. These palaeochannels are known to host several uranium deposits and drilled uranium prospects.

2010 drilling by Manhattan Corporation at the Project reported notable REE enrichments, and the first batch of Summit drilling results for 4 of the 14 RC holes drilled in Phase 2 at Stallion showed assays confirming resource potential, particularly at the margins of the mineralised zone.

1. ASX Release - 13 September 2022: Uranium Mineral Resource strengthens Stallion opportunity

PROJECT HIGHLIGHTS

np_tick-circle_590807_000000 1

Phase 2 exploration drilling completed at Stallion REE Project comprising 14 RC holes for 820m of infill and extension drilling

np_tick-circle_590807_000000 1

Historic assays confirm up to 2,666ppm pREO (Partial Rare Earth Oxides - CeO2 , La2O3 , Sc2O3 , Y2O3 ) , only accounting for 4 of the 17 rare earth elements, with samples previously not assayed for the other 13 REEs

np_tick-circle_590807_000000 1

The Company anticipates completing a maiden mineral resource estimate upon receiving the metallurgical test results and identifying the host to the rare earth minerals

np_tick-circle_590807_000000 1

Planning is underway for another extension and infill drilling phase

np_tick-circle_590807_000000 1

Potential for a maiden interim resource to be announced prior to the next phase of drilling

np_tick-circle_590807_000000 1

Historic uranium resource

Exceptional Drill Results

  • Best intercepts from the Phase 1 Drilling include:
  • STRC014: 23m @ 2,162.45 ppm TREO from 24m
  • STRC012: 15m @ 3,088.84 ppm TREO from 39m
  • STRC011: 17m @ 3,783.4 ppm TREO from 61m inc. 1m @ 1.52% TREO from 73m
  • Outlined a broad, relatively shallow mineralised zone that measures 2km x 2.5km, with a thickness averaging 18m and grade averaging ~1,750ppm TREO
  • Critical permanent magnet metals, neodymium (Nd) and praseodymium (Pr), or NdPr, averages 23.63% - substantially above the industry average of ~16%
  • The mineralised zone is open in all directions, and only the lack of drilling limits its scale
SUM-Stallion_Phase-1_NEW
SUM-Stallion_Phase-2_NEW

Building on Phase 1 Results

  • Best intercepts from the Phase 2 Drilling include:
  • STR023: 9m at 1664.12 ppm TREO from 58m
  • STRC017: 34m at 1021.8 ppm TREO from 37m
  • STRC019: 31m at 1298.37 ppm TREO from 63m

Future Work

  • Maiden Mineral Resource Estimate expected for Stallion upon receiving the balance of the results
  • Planning underway for another extension and infill drilling phase to be conducted
  • AMSUL (pH ~ 4) leach unsuccessful, moving to stronger digestions (H2SO4, HCl)